I think you would need to buy two of the mounting flanges (mild steel) which Tyga sell for a few quid each. Then braze them onto the pipes in place of the existing ones, which you can cut off. I haven't measured mine up but I was thinking of using some thinner pipe to sleeve it on the inside too. I'm fairly sure that the bolt positioning is different to standard too.