I would love to see the pipes being fabricated. Ti is complete bitch to form up, and stamping has to be done at some stupid temp to ensure it does not spring back.
The cleaner at the Collection Hall must move the NSR engine before he vaccums around it, they changed the plant to. I was VERY tempted to do a runner with that engine straight for Narita.