Last week I installed the braided front brake lines and removed the clutch perch, clip-ons, and top triple for powdercoating.
Saturday morning I took the bike through the canyon and up to Bear Lake for breakfast (80 mile round trip.) I had picked up a 32GB card for the GoPro and took video of the ride (see post above). The bike has outstanding compression (119/120), and the powervalves and everything else look great, but the jetting still needs a fair amount of clean-up. I've decided to have the JHA chambers dug out of storage and shipped here so I can just install them and do everything right, once and for all.
After the ride, I replaced the rear caliper with a spare I had already rebuilt and fitted with new EBC HH pads. It was time:
Refurbished caliper and pads, filled with fresh Motul RBF600:
Got the new tires fairly scrubbed in, although eventually I'll get the 17" MC21 rear on there so I can run Supercorsas instead of the limited selection for the current 18".
Next jobs will be mounting the JHA's and getting the flatslides dialed in, followed by powdercoating the front master cylinder once I the rebuild kit arrives.